sales@glorytekdrill.com
AM09:00-PM18:00
+86-10-52864265/52864786

GLHY300 Truck Mounted Water Well Drilling Rig

1943846

1943845

QQ图片20190801101213

QQ图片20190801101112

QQ图片20190801101216

Technical parameter

Performance Parameter Max. drilling depth: 300m
Hole dia.: 120-300mm
Weight Curb weight: 24500kg
Truck chassis weight: 9860kg
Drill rig weight: 14640kg
Dimension Transport condition(L*W*H ): 10565*2490*4150mm
Working condition(L*W*H ): 10125*2490*11800mm
Environmental Requirements Temperature:  -10℃~35℃
Altitude: <2500m
Truck Chassis Truck chassis: 6x6 off-road truck chassis( Shanxi Heavy Duty Automobile Co., Ltd)
Model: SX5256TYT
Engine Model: WP12.430E40
Power: 430HP(316kW)/1900 (r/min)
Torque: 2060N.m/1000-1400 (r/min)
Drill Rig Rotary Table Max. Torque: 5200 N.m
Rotating range: 27~267 r/min
Pressuring System Drilling tool rated pressuring: 30 kN
Feeding Speed: 0.4 m/s
Lifting System Lifting weight: 9100 kg
Lifting Speed: 1.0 m/s
Hydraulic system Rated pressure: 12.5 MPa
Mud Pump Flow rate: 600 L/min
Pressure: 2.0 MPa
Air Compressor Model: LGFD-12.5/14C
Air Flow: 12.5m3/min
Pressure: 1.4Mpa
Power: 130 Kw
Dimension: 1250*1430*1420mm
Weight: 1100kg
Drill Tower Height: 10024 mm
Capacity: 15800 kg